projects
Project work
Selected projects delivered in Kazakhstan and Russia. Some details are withheld under NDA - we publish only what has been agreed with the client. Our role is stated on each card.
No projects match this category yet. Try another filter.
Corporate portal modules for Aluminium of Kazakhstan JSC
We built five corporate portal modules for the Pavlodar site of Aluminium of Kazakhstan (ERG) as a subcontractor to the lead systems integrator.
- beforePaper requests
- how5 portal modules
- afterOnline approvals
- modules in production
- 5
- reference records migrated
- 14k
- approval time, down from 3-4 days
- < 1 day
Microsoft and Kaspersky licensing for Pavlodar Petrochemical Plant
Since 2023 we have been choosing the Microsoft and Kaspersky licensing model for the Pavlodar Petrochemical Plant and keeping track of its subscription renewals.
- beforeScattered records
- howAudit and tender
- afterOne license register
- of the specified requirement supplied
- 100%
- spend on a comparable subscription set
- -18%
- software budget forecast
- 3 years
Document management upgrade for a Pavlodar Region akimat department
For a department of the Pavlodar Region akimat we set up the transfer of citizen requests into the document management system, so nobody re-types them, and updated the approval routes.
- beforeManual re-keying
- howEDMS integration
- afterDeadlines under control
- to transfer a request into the EDMS
- 15 min
- manual re-keying
- 0
- from kickoff to acceptance
- 6 weeks
SLA-based IT outsourcing for Pavlodarenergo JSC
We remotely support 450 office workstations and servers of Pavlodarenergo in Pavlodar and Ekibastuz together with the company's IT team. Response and restoration times are fixed in the SLA.
- beforeUntracked tickets
- howService desk + SLA
- afterIn-house IT on growth projects
- workstations supported
- 450
- critical incident response
- 30 min
- tickets within SLA over 24 months
- 97%
Kaspersky endpoint and server protection for Ekibastuz GRES-1
We supplied and rolled out Kaspersky EDR on 900 workstations and 120 servers in Ekibastuz GRES-1's corporate network. The plant's control network was left untouched.
- beforeMixed antivirus
- howKaspersky EDR, 3 waves
- afterOne threat console
- workstations protected
- 900
- corporate segment servers
- 120
- of rollout in agreed windows
- 3 waves
Privileged access management for ForteBank JSC
As part of an integrator team we deployed Indeed PAM in ForteBank's server segment. Administrators and contractors now log in only through a request, and every session is recorded.
- beforeShared admin accounts
- howIndeed PAM
- afterAccess on request
- servers and devices connected
- 400+
- of PAM sessions recorded
- 100%
- from design to acceptance
- 4 months
1C:ERP and MES integration for a machine-building plant in Omsk
We connected 1C:ERP with the MES of four production departments at an Omsk machine-building plant through a message bus. Orders, bills of materials and output are no longer entered twice.
- beforeDouble data entry
- howRabbitMQ bus
- afterERP and MES in sync
- manual data entry
- -70%
- to identify discrepancies
- ≤ 24 h
- production departments in one data flow
- 4
TrueConf Server rollout for a manufacturing holding
More than 300 employees of a manufacturing holding moved from Microsoft Teams to TrueConf Server. Active Directory sign-in, meeting rooms and mobile clients work as before.
- beforeForeign cloud
- howMove without downtime
- afterVideo inside the network
- users
- 300+
- to move every department
- 6 weeks
- meetings cancelled due to the switch
- 0
R-Vision SIEM deployment for a financial institution
For a financial institution we deployed R-Vision SIEM and SOAR, connected more than 40 event sources and handed monitoring over to the client's SOC shift. We worked as a subcontractor.
- beforeScattered logs
- howR-Vision SIEM
- afterResponse playbook
- event sources
- 40+
- monitoring by the client team
- 24/7
- to an incident ticket
- ≤ 5 min
BI energy monitoring for an industrial complex
For an industrial complex in Pavlodar Region we set up loading of power consumption data from SCADA into Power BI every 5 minutes. Engineers see usage by workshop and substation almost right away.
- beforeMonthly roll-up
- howTelemetry to BI
- afterUsage visible same day
- telemetry load interval
- 5 min
- metering points
- 40+
- workshops and substations covered
- 12
Electronic queue and analytics for a regional multi-specialty hospital
Our electronic queue runs the outpatient service of a regional multi-specialty hospital. It is linked to the hospital information system, and management sees waiting times and doctor workload.
- beforeLong queues
- howE-queue system
- afterLoad-based schedules
- average front-desk waiting time
- -30%
- kiosks and displays on one system
- 12
- from kickoff to launch
- 2 months
Infrastructure and CI/CD for a fintech service
We moved a payment service to a highly available Kubernetes cluster in Yandex Cloud and automated version releases.
- beforeManual releases
- howKubernetes + CI/CD
- afterAutomated releases
- availability over 12 months
- 99.95%
- to release a new version
- 15 min
- availability zones
- 3
Mobile application for a logistics operator
For a logistics operator we built an app for 180 drivers and a dispatcher workspace. The app works without coverage and sends trip data and cargo photos to 1C once the connection is back.
- beforePaper waybills
- howDriver app
- afterTrips in 1C, no paper
- drivers on the app
- 180
- trip data in 1C when online
- same day
- works without coverage on the road
- offline
BI dashboards for a trading company
A wholesale company moved from manual Excel reports to Power BI. Data on sales, stock, shipments and finance refreshes every morning by 7:00.
- beforeManual reports
- howPower BI dashboards
- afterOne set of numbers
- data sources
- 4
- fresh numbers every morning
- 7:00
- of analyst time freed per week
- 16 h
1C customization for a regional retail chain
In 6 weeks we connected a regional retail chain's 1C to a marketplace and added a margin report by sales channel.
- beforeManual order entry
- how1C-marketplace sync
- afterOrders land in 1C
- project duration
- 6 weeks
- catalogue items in the exchange
- 8k
- stock upload cycle
- 30 min
IT support for a network of medical centres
Six branches of a medical centre network used to be served by three vendors. Now we support all 120 workstations, the medical information system and 1C under one contract.
- beforeThree contractors
- howOne contract
- afterOne accountable party
- branches under one contract
- 6
- average first response
- 12 min
- workstations
- 120
AutoCAD to nanoCAD transition at a machine-building plant
We moved 50 seats of a machine-building plant's design bureau from AutoCAD to nanoCAD: supplied the licenses, adapted the LISP scripts, trained the designers and supported the transition for six months.
- beforeNo AutoCAD renewals
- howMethod and scripts
- afterBureau on nanoCAD
- seats
- 50
- designer training groups
- 3
- of transition support
- 6 months
Service desk for an educational institution
In two weeks we chose and launched an IT request portal on Zammad for 300+ staff of an educational institution. No licenses had to be bought, since Zammad is open-source.
- beforeTickets in messengers
- howZammad portal
- afterDeadlines in plain sight
- staff on the portal
- 300+
- from selection to launch
- 2 weeks
- license costs: open-source software
- 0